5 Jun 2026
Waukegan Casino Project Enters Permanent Phase with Full House Resorts Groundbreaking

Full House Resorts and American Place Casino marked the start of construction on June 3, 2026, with a groundbreaking ceremony in Waukegan, Illinois, where officials gathered to celebrate the shift from a temporary facility to a permanent $302 million casino complex on a 42-acre site. The event signals the replacement of the interim casino that has operated since 2023, and the new venue will span approximately 200,000 square feet while incorporating 1,300 slot machines along with 80 gaming tables plus restaurants and additional amenities. Construction crews are expected to move forward with phased development that targets an opening window between 2027 and 2028, and local leaders anticipate the project will generate employment opportunities while supporting broader economic activity in the region.
Ceremony Details and Project Timeline
Participants at the June 3 ceremony included representatives from Full House Resorts, the company behind the Nasdaq-listed FLL ticker, along with American Place Casino executives and Waukegan municipal officials who together turned the first soil on the permanent structure. The temporary casino has provided continuous operations since its launch in 2023, yet the new facility will consolidate all gaming and hospitality elements into one purpose-built location that replaces the interim setup entirely. Project planners have outlined a phased approach to construction that allows portions of the complex to come online progressively, which means early amenities could reach the public ahead of full completion while the remaining work continues through the targeted 2027–2028 window.
Facility Specifications and Design Scope
The planned venue covers roughly 200,000 square feet and will house 1,300 slot machines paired with 80 gaming tables in addition to multiple dining options and supporting amenities that together create a comprehensive entertainment destination. Site preparation on the 42-acre parcel has already accounted for infrastructure needs such as parking, utilities, and access roads, and these elements will integrate with the main building footprint to accommodate expected visitor volumes once operations begin. Full House Resorts has coordinated the design to align with Illinois gaming regulations, which ensures the permanent structure meets all required standards for safety, accessibility, and operational compliance from the outset.

Employment and Regional Economic Factors
Project estimates indicate the permanent casino will create both construction-phase positions and long-term operational roles once the facility opens, and these opportunities are projected to contribute to Waukegan’s local economy through direct hiring plus indirect spending at nearby businesses. Data from regional development reports show that similar casino projects in Illinois have historically supported workforce expansion in hospitality, security, maintenance, and food service sectors, while tax revenues generated from gaming activity flow back to municipal and state budgets. The 42-acre site allows for future expansion potential beyond the initial 200,000-square-foot footprint, which means additional phases could extend employment benefits if demand supports further growth after the 2027–2028 opening period.
Transition from Temporary to Permanent Operations
The existing temporary casino, active since 2023, will continue running without interruption until the new structure reaches sufficient completion for a phased transition that minimizes service gaps for patrons. Once the permanent venue opens, all gaming equipment including the 1,300 slots and 80 tables will relocate or upgrade into the larger space, and the temporary site can then be decommissioned according to local planning guidelines. This sequence allows Full House Resorts to maintain revenue continuity while the larger facility comes online, and it also provides time for staff training and operational testing within the expanded layout before full-scale public access begins.
Conclusion
The June 3, 2026, groundbreaking in Waukegan sets in motion a multi-year construction effort by Full House Resorts and American Place Casino that will deliver a 200,000-square-foot permanent facility featuring 1,300 slot machines, 80 gaming tables, restaurants, and supporting amenities on the 42-acre site. The project replaces the temporary casino in operation since 2023, with phased openings planned for 2027–2028 and anticipated benefits for local employment and economic activity throughout the surrounding region. According to Chicago Tribune coverage, the development aligns with established Illinois gaming frameworks that govern licensing, construction standards, and revenue distribution. Observers tracking similar projects note that such facilities often integrate with broader community planning goals, and the American Place Casino timeline positions Waukegan to realize those outcomes as construction advances toward completion.